|
[+]
|
|
Soil and groundwater
|
|
Metre for metre, the soil conditions along the entire route of the Noord/Zuidlijn have been identified. That was a big job, and it was undertaken with great attention to detail.
|
|
|
|
[+]
|
|
Building Safely
|
|
In several places along the way, the tunnel-boring machines will be passing relatively close to the foundation piles of some buildings and bridges.
|
|
|